Home

   
Main Hull Fitout

The main hull is leveled ready for crosspals & bracing

As the cross spalls & bracing go on the bulkheads are being pressed.

The hatch surrounds were a standard size throught the tri. So a special press was made for the job.

With the fore deck on and the centreboard in place. it was time to pre-fit the engine.

Installing the mast bulkhead.

The coachouse & aft deck being fitted.

Holes for the radomes are cut & backstay chainplates added.

Now back in the oven for final fairing & painting, the radomes have been fitted & transom laminates continue.

Aft water ballast tanks either side of the rudder cassette.

The fairing continues.

With the white top coat complete the complex signage can start.

In our quest for accuracy, the laser dumpy is used right throughout the build. Even when it comes to signage!

She pokes her nose out of the facility for the first time.

Showing the other side to her personality.

Back to B&Q/Castorama

 
 
No.1 Pacific Highway, Somersby NSW 2250. Australia
Phone: 61 2 43405500
Fax    : 61 2 43405511

         

© 2002 Boatspeed